Construction of a Ten storied building (including -5.60m basement) with approximate total floor area of 13,100m2 on 96nos of concrete piles and all civil & MEP work related to the construction. Excavation & Earthwork, Concrete, Masonry, Waterproofing, Carpentry & Joiner, Metal, Roofing
Painting and Landscaping work under Civilwork scope. Hot water system,
Cool water system, Drainage & Storm water system,Electrical system, Fireflighting system, Air conditioning system,Data installation, CCTV system, Access control system, Q-matic system, Conference hall professional system, SMATV system, Nurse call installation, Elevators, Buliding management system under MEP work scope. Complete with
122nos patient’s bed including ICU 05beds, HDU 06beds and sleep labs 04 beds