Sierra Construction

Project details

New Bridge Construction Over The Kelani River

New Bridge Construction Project over the Kelani River (Lot 4, Civil Works) Package 1, Steel Bridge Section
Scope Scope Scope

New Bridge Construction Project Over the Kelani River” spreads over 3.0km as an elevated road construction project, in between Orugodawatta and Ingurukade Junction. The construction period is 36 months & the project is funding by JICA (Japan International Cooperating Agency Loan). The project includes, construction of 500 cast in-situ bored piles, 50 steel and concrete piers, 7,000m3 concrete pile caps, 16,850 m3 “U” shape retaining walls & decking slabs and all other related specialized works in bridge construction.

  • Client: Toda Corporation
  • Completion Date: 30th August 2021
  • Location: Kalaniya, Sri Lanka